Colorado Springs, CO

ERC was retained as part of a design team to assist with improvements on an urban section of Fountain Creek through Colorado Springs. Work on this 3,800 foot section included bioengineered bank stabilization and intensive native riparian planting to aid in flood flow retention and terrestrial habitat. Work included realigning the channel, increasing channel conveyance and relocating residences and businesses for public protection during peak flood events in Fountain Creek.