In 2019, a change in State Dam Safety regulations allowed the reservoir at Barr Lake to be enlarged.  To protect State Park facilities from the increased water level, ERC undertook a project to identify impacted roads, trails and other infrastructure then design modifications to ensure their continued safe use by the public. Tasks included: developing design drawings and technical specifications to raise 3 gazebo structures, 1 pedestrian bridge, 3,000 linear feet of gravel trail, 800 linear feet of wooden boardwalk on concrete piers, and 3,300 linear feet of gravel road.  The facilities were designed to meet Colorado Parks & Wildlife (CPW) standards and current building codes.  Construction was completed in 2022.